[Memorack] The crash breaks open several of those tankers and releases raw chemicals into the air and the river.

Magnus bse at springmail.com
Sun Apr 8 16:16:52 CEST 2007


The above scenario of finding the Formosan termite in a railroad trestle bridge structure actually happened in the summer of 2003.
The outermost layer should be breathable and both wind and water resistant.
First, they will miss significant deficiencies. A full inspection of this type of structure would have taken between 2 to 3 weeks of field work with additional time required for analysis. This breakthrough development in the detection of pests is of great assistance and an essential tool for any pest inspector.
A full inspection of this type of structure would have taken between 2 to 3 weeks of field work with additional time required for analysis.
Segments A and C are wood and Segment B is steel. On May 23 the students presented their projects to a panel of 6 research scientists, college professors and professionals.
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://mail.tiolive.com/pipermail/memorack/attachments/20070408/69573209/attachment.htm>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: not available
Type: image/gif
Size: 17692 bytes
Desc: not available
URL: <http://mail.tiolive.com/pipermail/memorack/attachments/20070408/69573209/attachment.gif>


More information about the Memorack mailing list